Flush double-open configuration with an integrated mesh sash. Large panoramic openings, but the client can still leave the window open at night without letting the insects in.
panoramic openings without losing daily ventilation.
| Opening | Inward casement + mesh sash |
|---|---|
| Profile depth | 90 mm |
| Wall thickness | 1.8 mm |
| Thermal break | PA66 nylon, 35.3 mm |
| Visible frame / sash | 46 / 58 mm |
| Glass | 5G+24A+5G · 5G+12A+5G+12A+5G |
| Extra | Integral-bend full-foam isobaric strip |
| Design | Frame–sash flush |
All WMS series share the same base build: 6063-T5 architectural aluminium, automotive-grade EPDM triple seals, dowel-pin injection corners with two-component adhesive, concealed floor drainage and anti-pry locking points. Hardware is SIEGENIA or HOPPE, 80 kg standard with 150 kg optional.
Grades are on a 9-point internal scale, not an EN classification. If your specification calls for EN 12207 / 12208 / 12210 classes, send the schedule and we will return the tested configuration.
| MOQ | 1 × 20GP container, mixed models accepted |
|---|---|
| 20GP | Indicative 100–150 m² of standard casement windows |
| 40HQ | Indicative 250–300 m² of standard casement windows |
| Lead time | 20–30 days after deposit and shop-drawing approval |
| Incoterm | FOB Tianjin / Xingang |
| Payment | T/T 50% deposit + 50% before shipment |
| Packing | Wooden crate, corner-protected, labelled per opening mark |
| Documentation | Available on request |
Loading figures are indicative for double-glazed casements in crate packing. Larger units, triple glazing or thick laminate reduce the square metres per container — the exact number is confirmed once your window schedule is fixed.
Resort and villa projects in tropical and coastal markets where large openings and daily ventilation are both required.
For hot and humid markets the binding constraints are usually wind load, water tightness and hardware corrosion — not U-value. Tell us the design pressure and the distance from the coast, and we will confirm which surface finish and hardware grade the project needs.
Drawings, opening sizes, glass build and destination port are enough to start. Reply within 48 hours with a priced quotation and a container loading plan.